MOQ bands
Stock colorways from 250 pieces. Logo and color tweak from 300. New pattern, stay length or wet/dry divider from 800. Below those floors we quote heat-transfer short runs, not a full tool change. Camp 4 duffel bag embroidery sits on the 300-piece logo band, not the 250-piece stock band.
Sampling clock
Colorway on an existing pattern: 12–18 working days. New pattern with recut framesheet: 18–25 days. Embroidery digitizing adds 3 days if the file is not DST-ready. A sample is a stitch and logo check. It is not a freeze of next-season denier unless the lot number is on the ticket.
Print, stitch, color
Screen print on flat lids, embroidery on 600D bases, woven labels on private-label hangtags. Team numbers use heat-transfer or embroidery; sublimation is refused on PU-coated ripstop because the coating blocks dye. Color chips are matched against 210D or 420D, not a screen JPEG.